The overall ordination of the intervention and the program ordered arrangement, both in floor and in
The new building is developed in a single volume, combining one and two floors, corresponding to the
The building extension is proposed aligned with - Alberes street, at the site of the previous sports
The main access to the facility is located on the opposite side of the plot so it is possible to get
The scheme makes very fine use of materials. It consists mainly of light grey tinted concrete with a